P
Parnate
Mage
- Dec 16, 2021
- 514
So I started working on the Saudi project and the work pressure is intense.
I was given a job to do at 11 am and 1 pm the manager dropped a message on teams saying it was urgent and he wanted the output immediately.
I did fast and shared all the output. I was only supposed to share two files but because of the xref issues of AutoCAD I shared all the files that were generated. The manager got angry and called me and was so blunt. But I mean I am a human being, if you ask for something so immediately and put so much pressure , I am bound to make mistakes.
I was given a job to do at 11 am and 1 pm the manager dropped a message on teams saying it was urgent and he wanted the output immediately.
I did fast and shared all the output. I was only supposed to share two files but because of the xref issues of AutoCAD I shared all the files that were generated. The manager got angry and called me and was so blunt. But I mean I am a human being, if you ask for something so immediately and put so much pressure , I am bound to make mistakes.